Challenge

During the demolition process of the existing roofing rotted decking was discovered. The severity of the deterioration required extensive amounts of the existing structure to be redecked. Sourcing a qualified subcontractor to install new steel decking with zero notice, during a weather event, the week of Christmas.


Solution

60 Mil Black EPDM tapered roof with insulation system installed upon new rebuilt deck. Exterior flashing sheet metal, installed new roof drains for proper drainage. Installed galvanized steel stairs, which required crane operation. Managed steel erector subcontractors and mechanical contractor for roof drains and audited and inspected their work.


Benefit

Longevity and long term waterproofing, increased R Value, increased longevity of the building, new steel installed to access 2nd level roof by way of new steel stairs, better storm drainage to benefit the life of the roof and building.

Project Gallery

Advanced Design Contracting

LIC #: BC631382

Our Office

Advanced Design Contracting 9250 Isanti St NE

Blaine, MN 55449

Socials

  • Facebook
  • Instagram
  • LinkedIn
  • Youtube

Inquiries

For any inquiries, questions or commendations, please call: 651-340-1164

Roof Leak?

Call Us 651-340-1164

© 2024 by Advanced Design Contracting. Powered and secured by Promoting Me, LLC

bottom of page